Weifang Chenhua Nonwoven Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Colin
  • Company Name : Weifang Chenhua Nonwoven Co., Ltd.
  • Tel : 86-536-5295955,18653685072
  • Fax : 86-536-5522139
  • Address : Shandong,Shouguang,Weifang City,Taitou Industry District,Shouguang city,Shandong Province
  • Country/Region : China
  • Zip : 262735

SBS/APP bitumen waterproof membrane making machinery

SBS/APP bitumen waterproof membrane making machinery
Product Detailed
Related Categories:Other Machinery
SBS/APP bitumen waterproof membrane making machine 1)Rational structure 2)Low transportation,installation,adjustment cost

SBS/APP bitumen waterproof membrane making machinery

Product specification

The system can produce SBS, APP modified asphalt waterproofing 

membrane with the following specifications:

Base mat: polyester mat, fiberglass mat

Face: sand, PE or Aluminium

 

 

Technical specification 

Model Name

DYZ---200

DYZ---300

DYZ---500

Machine Type

Simple

Midsize

Large

Annual Output (million m²)

1.5--2

2.5--3

4.5--5

Operation Mode

Semi-automatic

Semi-automatic

Computer control

Contour dimension

(L×W×H meter)

25×4×2.5

35×4×3.8

45×4×4.8

 

1.1 Open bookviews devices

 

This is two positions device which use cylinder to support the reinforcement

 

1.2 Intermediate feed device 

 

1.3 Reinforcement connecting device

 

By means of double sides pressing board, the device press the material on one side, daubs chemical glue on the material's other side, which makes the materials mixed together automatically and reduces the defective goods rate because of reinforcement joints to the greatest extent

 

1.4 Reinforcement drying device

 

No need to stop the operation while reinforcement jointing it, releases and dry reinforcement automatically

 

1.5 Auto rectifying device

 

1.6 Impregnation tension control device

 

Extrusion by cylinder, asphalt coating roll impregnation can be adjusted up-down. It adopts unique reinforcement tension control

 

1.7 Asphalt coating device

 

Coating asphalt twice can adjust the position of reinforcement in the coiled material, meanwhile it ensure its workability. The independent asphalt coating roller can regulate up and down by electronic. With the control of accurate electronic device, it can master the exact thickness of coiled material. During each class production, the rest materials can be reused. The flue gas environmental protection system of preimpregnated asphalt coating adopt closed overall frame form which use the method of ejecting smoke in petticoat pipe and absorbing smoke outside

 

1.8 Sand-scattering device

 

This set of device adopts the technology of automatic tracking and rectifying sanding, which reduces the waste of sand to the greatest extent

 

1.9 Sand lifting device

 

1.10 Filming and thickness-measuring device

 

Through this device, we can regulate the positions of the coiled material and the membrane optionally, which reduce the defective goods, and the power-driven lifting technology can save manpower 

 

1.11 Sand-pressing with suspending cooling device

 

This device extended 10-15 meters which speed up the cooling to a certain extent. Advanced thickness measurement device detects the products quality to ensure the thickness of the stability 

 

1.12 Cooling embossing device

 

1.13 Finished products storage device

 

1.14 Traction-Spring devices

 

Minimize membrane tension on the winder, assist to storage product and auto winder using effects.

 

1.15 Auto winder device

 

Inverter computer programming and touch screen synchronization control method realized conveying felt,ounting,cutting felt, gluing tape, propelling felt and rolling automation.

 

1.16 Electrical operating control devices

 

1.17 Mixing-weighing system devices

 

Cutting type mixing blades ensure the raw material solubility and avoid coking of tank wall. Emptying from the tank's taper bottom makes the raw materials discharged completely. Electronic digital display weighing guarantee the accuracy of the mixture ratio.The rational distribution of linepipe,gel and grinding oil pump for the operating deck. Make practicability more reasonable. Flue gas treatment technology: filtrate strive first and oil fume then to ensure the flue unimpeded via dismountable and washable filter

 

1.18 Horizontal storage tanks

 

1.19 Powder-converying system

 

The process flows are as following:First,with PLC control, storage tank delivery material to charger through pneumatic valve. Next supply the material to gauging tank from spiral conveyer.Third,it shows the needed material quantity by electronic balance, and carries the material to spiral conveyer pass sealed feeders. At last, feed the material to each agitator tank by PCL controlling. If you need to choose several working process, then directly select the agitator tank which you need on PCL control panel

 

1.20 Smoke purification device

 

Using spray of welcome method, dust gauze, active carbon adsorptive process and demister to dispose the smoke. Then attaining the environmental standardization,Lowcost,effective.Saving more factory space

 

SBS/APP bitumen waterproof membrane making machinery



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.